Electrical Distribution
& Control Panel Solutions
Customer
Briggs & Forrester Engineering Services
Scope
To supply, install & commission a Schneider Electric Prisma P 1250 A LV switchboard incorporating a castell key exchange system along with the associated sub distribution Panelboards, stand alone PFC and Lift changeover panels complete with dual bypass.
Project
Located on Lakeside, Doncaster, the National College for High Speed Rail will comprise circa 76,000 sq ft of teaching and workshop space, including specialist rail equipment such as 150m of external track and catenary. Along with Birmingham, it will train thousands of engineers to meet HS2’s future needs, as well as those in the wider rail sector, by providing a real workplace environment to prepare students for work on high-speed rail infrastructure.
The £25m State Of The Art College will be opening its doors to a first intake of industry professionals and apprentices in September 2017, with courses for over 1,000 students aged 18+ starting the following academic year.
KDS work with several main manufacturers to select the most appropriate solution to suit our customers requirements and constraints.
Our solutions are based around Eaton xEnergy, Schneider Electric & Cubic Modular Systems.
Our dual metered split load lighting & power board answers the needs for compliance with the latest building regulations.
We offer metered lighting & power boards utilising Eaton Electric, Schneider Electric and ABB.
Eaton’s Licenced Panel Builder Partner for the West Midlands
We offer xEnergy switchboards up to 5000A
Factory built panelboards
Split load Lighting & Power boards
We provide the total solution for our customers.
From initial design, manufacturing & testing
To installation & commissioning
And with full engineering and technical backup